Without ever becoming complacent with the status quo, we deliver the highest quality through continuous technological improvements.

Also, we are actively developing new repair methods with reduction of the component life cycle cost in mind.

index

1

Applying our know-how to setup a solutions team for even the most difficult repairs. Contribute to cutting customer’s costs.

Customer trust · Cost improvement efforts

Production related problem solving efforts
  • Successful completion of the B767 L/G OUTER CYLINDER inside repair
Action
The repair area was inside the cylinder, approx. 1500mm from the edge. Being very hard to reach, the repair was extremely difficult, but by drawing on our skills of creativity and refinement throughout the process, we were able to complete the chrome plating repair within the original OH schedule.
Result

By the achievement of the restoration during the Overhaul term of works, completed without the change of the customer maintenance plan.

2

Suggestion to improving customers equipment as MRO with airline operators viewpoint.

Customer trust · Cost improvement efforts

Proposal of trouble prevention method during operation
  • B767 NLG Air Ground Sensor Target installation method improvement
Action
Customers frequently experienced loose or missing Target and it caused the cancel of flight.
We suggested to the customer change of fixed method from Rivet to Hi-Lock Faster and apply Sealant to the surface at the time of Target installation.
Result
  • OEM accepted our suggestion and repair method was approved.
  • Contribute to stable operation.
  • Prevent PDA*

*Parts depart from Airplane


B767 NOSE LANDING GEAR
3

Providing accurate and timely technical support.
Contributing to Operation Support with flexible production system.

Operation support cases

Line & Dock Support / Technical Support
  • AOG, accelerated production & skilled support
  • Investigating & providing information to technical inquiries
  • CMM improvement & suggesting repair methods
FY2014 FY2015 FY2016 FY2017
Total responses 14 7 7 11
Expert dispatch 1 2 2 1
Accelerated production 6 3 2 7
Skilled support - - - 2
Urgent shipping, others 7 2 3 1
Provide information & tech support to line maintenance 73 90 50 40
4

Actively promoted parts salvation by reviewing repair methods and investigating new repair methods.

Other (parts salvaging efforts)

Review CMM content & developing new repair methods
  • Clarify & Improvement CMM instructions
  • Part Saving by CMM Review
FY2014 FY2015 FY2016 FY2017
CMM amendments 50 35 46 21
Parts salvation by Engineering Deviation (New items only) 14 11 11 16
Estimated Catalog Parts Price Value Amount (unit : JPY) 182 million 203 million 19 million 57 million